The 2,800 MW to 3,600 MW number laid out in the roadmap was the result of analysis by consulting firm Acelerex that examined system needs that can be met by energy storage in a least‐cost combination of resources as New York approaches its 50% by 2030 renewable portfolio standard target.
The report also says that analysis was “limited in its distribution system detail and consequently neither reflects an upper bound of ratepayer benefit nor maximizes the amount of storage that can be deployed in the state.”
Peter Maloney, Contributing Editor, Utility Dive