Acelerex provides advanced design and integration services to ensure successful project delivery.
Project Design Documentation – Requirements and Solution Documents for approval of Project Owner / Client
Cabinet Design & Engineering – Design & Engineering for EMS & control system cabinet including power supply calculations, surge protection, profile diagrams, wiring design, cooling and ventilation design, rack design, and weight calculations
Fire Alarm Integration – Design for integration of fire alarms including monitoring, alarms, and action plans
Project Communication Integration – System communication design & execution for successful project integration
Network Design & Configuration – Design of the router, switches, network cables, IP addressing, diagram of design, firewall rules, and a design document Configuration of network firewall rules, subnets, IP addressing, verification of all device communications, cyber security policy and a document of the configuration
Electrical Wiring Diagram – Electrical wiring of the REX Equipment, detailing how components are connected and powered
Procured Systems Specifications – Technical specifications for the procured REX Equipment
Interconnection Study – Power flow modeling to quantify the injection capacity of electrical locations – threshold for triggering distribution system upgrades
Project Model for Utility – Power Flow, Fault, Transient Stability model of project to supply to local utility grid code
BOP PLC Interface – Interface to the BOP PLC
Cyber Security Compliance Support – Acelerex cyber security measures and procedures are in accordance and aligned with NERC CIP standards and guidelines
Digital Twin Report – Report of the project use cases conducted through the Digital Twin, demonstrating functionality and confirming operational performance within simulated environments
SAT & FAT Report – EMS Site Acceptance Test & Factory Acceptance Test including planning & test reports
LV/MV Drawings – Detailed drawings of the LV and MV
LV/MV Design – Electrical LV (Low Voltage) and MV (Medium Voltage) design including the layout, components, and calculations necessary to ensure compliance with standards, support operational requirements, and provide safety for personnel and equipment.
Emergency Response Plan – Establishment of hazards and risks, emergency procedures and protocols, the roles and responsibilities of personnel, communication and notification procedures, training and drills for personnel, maintenance and inspection requirements, and record-keeping and documentation.
Contact Us Today to receive a quote!